Dogus Construction Group selects Nexans cables to power new Istanbul Metroline

Feb 16, 2016

Dogus Construction Group has chosen Nexans to supply LV and MV cables for Istanbul’s new Metroline, establishing an additional 20km of rail to service the city’s suburbs. As a result of the initial specification study, Nexans will supply both low voltage and medium voltage cables for the 563 million Euro project commissioned by Istanbul Municipality (IBB).

Nexans created a tailor-made solution for the Istanbul Metroline project with enhanced mechanical protection for the cables, rodent proof outer sheathing and robust fire testing.

Cables deliveries will be scheduled throughout the year in installments, with each lot being delivered within six weeks. The project will be completed by 2017.

The new line will include 16 additional stops to the existing Metroline network, and will take 24 minutes to travel from the centre of Istanbul to the suburbs. It will be able to carry 65,000 passengers an hour in each direction, serving the city’s growing suburban districts.

Emre Erol, Senior Sales Manager at Nexans Turkey said “Nexans is pleased to have confirmed a contract with one of the world’s most reputable construction companies after an extremely competitive pitch process. We are pleased to be increasing the capacity of rail lines in Istanbul to serve the growing suburban communities.

For further information, you can visit our website www.nexans.com.tr or visit us at Eurasia Rail Exhibition between 3-5 March, 2016 at Hall 10, D1012.

 

 

Your Contact

Aslı YILDIZ

Contact us

Topics on which you wish to get more informations:

Required fields*

Please check your entry and try again.

An email address must contain a single @

Personal data protector

You have the right to object to the processing of your personal data and/or their use for direct marketing or commercial purposes

Thank you!

Thanks for contacting us. We will be in touch with you shortly.

Error

An error occurred. Please try again.

Close